Islamabad: Water entered the office of the Director General (DG) Media at the National Assembly during a fire safety drill conducted by the Capital Development Authority (CDA).
CDA staff conducted a fire safety drill at the National Assembly on Friday. During the exercise, water used to extinguish the simulated fire reportedly leaked into the office of DG Media Zafar Sultan.
The leakage from the ceiling caused the office to become flooded with water. The office kitchen and washroom were also affected, with water accumulating in both areas.
According to the available details, the water entered the office through leakage in the ceiling installed above the premises. The incident occurred while the CDA staff were carrying out the fire safety exercise inside the National Assembly building.
Although the drill was conducted as part of routine fire safety preparations, the incident raised concerns over the arrangements made to manage and drain the large quantity of water used during the exercise.
The CDA had conducted the fire safety drill on Friday, but proper drainage of the water was reportedly not carried out due to negligence on the part of the relevant staff.
As a result, water accumulated inside the DG Media’s office, including its kitchen and washroom, causing disruption to the office’s routine activities.
The incident has also highlighted the need for better coordination and precautionary measures during emergency preparedness exercises in sensitive government buildings. Fire safety drills are intended to improve emergency response and protect lives and property, but the incident at the National Assembly demonstrated that arrangements for handling the aftermath of such exercises are equally important.
The National Assembly is a key state institution, and offices within the building house officials responsible for a range of parliamentary and media-related activities. Any disruption caused by water leakage or inadequate drainage can affect routine operations.
The incident reportedly occurred during the CDA’s exercise rather than as a result of an actual fire. The water was being used as part of the fire safety drill when it reached the DG Media’s office.
Further details regarding the extent of the damage, the cause of the ceiling leakage and whether any action will be taken against the staff responsible for the drainage arrangements were not immediately available.



