{"id":5616,"date":"2026-07-12T10:54:15","date_gmt":"2026-07-12T10:54:15","guid":{"rendered":"https:\/\/paksouch.com\/?p=5616"},"modified":"2026-07-12T10:54:15","modified_gmt":"2026-07-12T10:54:15","slug":"audit-report-reveals-over-rs29-41-billion-losses-at-neelum-jhelum-hydropower-company","status":"publish","type":"post","link":"https:\/\/paksouch.com\/?p=5616","title":{"rendered":"Audit Report Reveals Over Rs29.41 Billion Losses at Neelum-Jhelum Hydropower Company"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>ISLAMABAD:<\/strong> The Auditor General of Pakistan has reported that the <strong>Neelum-Jhelum Hydropower Company<\/strong> incurred losses exceeding <strong>Rs29.41 billion<\/strong>, highlighting persistent operational disruptions and financial challenges facing the major hydropower project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to the audit report, the prolonged shutdown of the project&#8217;s powerhouse resulted in an estimated <strong>loss of Rs99.17 billion<\/strong>. The report also noted that investigations into the repeated collapses of the <strong>headrace<\/strong> and <strong>tailrace tunnels<\/strong> have yet to be completed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The audit found that the company&#8217;s financial performance has been in decline since the <strong>2022\u201323 fiscal year<\/strong>, largely due to repeated operational interruptions and the high costs associated with repairing damaged infrastructure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The report stated that electricity generation remained <strong>completely suspended from July 2022 to August 2023<\/strong> following the collapse of the tailrace tunnel, resulting in a significant loss of revenue and affecting the project&#8217;s financial sustainability.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to the audit, the powerhouse has remained <strong>out of operation since May 1, 2024<\/strong>, after the collapse of the headrace tunnel. The continued closure has further compounded the project&#8217;s financial difficulties.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The report added that the costs of repairing and rehabilitating both tunnels have substantially increased the financial burden on the company.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Another challenge identified by the Auditor General was the project&#8217;s inability to obtain approval of its <strong>reference tariff<\/strong> from the <strong>National Electric Power Regulatory Authority (NEPRA)<\/strong>, a factor the report said has contributed to the company&#8217;s ongoing financial problems.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The audit also pointed out that <strong>insurance claims related to the losses caused by the tunnel failures and operational disruptions had not been secured<\/strong>, leaving the company without compensation for a significant portion of the damages.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Neelum-Jhelum Hydropower Project is one of Pakistan&#8217;s major hydroelectric generation facilities and plays an important role in the country&#8217;s energy sector. Repeated technical issues affecting the tunnels have raised concerns about the project&#8217;s long-term operational reliability and financial viability.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In its recommendations, the Auditor General called for the <strong>pending investigations into the tunnel failures to be completed without further delay<\/strong> and urged the relevant authorities to take the necessary measures to restore the powerhouse to full operation as soon as possible.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The report emphasized that timely completion of the investigations and restoration of electricity generation are essential to reducing further financial losses and improving the project&#8217;s overall performance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The audit findings are expected to draw attention from policymakers and the energy sector as authorities consider measures to address the project&#8217;s technical challenges, strengthen oversight, and restore one of the country&#8217;s key hydropower assets.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ISLAMABAD: The Auditor General of Pakistan has reported that the Neelum-Jhelum Hydropower Company incurred losses exceeding Rs29.41 billion, highlighting persistent operational disruptions and financial challenges..<\/p>\n","protected":false},"author":1,"featured_media":5617,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-5616","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pakistan"],"featured_image_urls":{"full":["https:\/\/paksouch.com\/wp-content\/uploads\/2026\/07\/437909_3723247_updates-1.jpg",700,400,false],"thumbnail":["https:\/\/paksouch.com\/wp-content\/uploads\/2026\/07\/437909_3723247_updates-1-150x150.jpg",150,150,true],"medium":["https:\/\/paksouch.com\/wp-content\/uploads\/2026\/07\/437909_3723247_updates-1-300x171.jpg",300,171,true],"medium_large":["https:\/\/paksouch.com\/wp-content\/uploads\/2026\/07\/437909_3723247_updates-1.jpg",700,400,false],"large":["https:\/\/paksouch.com\/wp-content\/uploads\/2026\/07\/437909_3723247_updates-1.jpg",700,400,false],"1536x1536":["https:\/\/paksouch.com\/wp-content\/uploads\/2026\/07\/437909_3723247_updates-1.jpg",700,400,false],"2048x2048":["https:\/\/paksouch.com\/wp-content\/uploads\/2026\/07\/437909_3723247_updates-1.jpg",700,400,false]},"author_info":{"info":["admin"]},"category_info":"<a href=\"https:\/\/paksouch.com\/?cat=3\" rel=\"category\">Pakistan<\/a>","tag_info":"Pakistan","comment_count":"0","_links":{"self":[{"href":"https:\/\/paksouch.com\/index.php?rest_route=\/wp\/v2\/posts\/5616","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/paksouch.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/paksouch.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/paksouch.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/paksouch.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=5616"}],"version-history":[{"count":1,"href":"https:\/\/paksouch.com\/index.php?rest_route=\/wp\/v2\/posts\/5616\/revisions"}],"predecessor-version":[{"id":5618,"href":"https:\/\/paksouch.com\/index.php?rest_route=\/wp\/v2\/posts\/5616\/revisions\/5618"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/paksouch.com\/index.php?rest_route=\/wp\/v2\/media\/5617"}],"wp:attachment":[{"href":"https:\/\/paksouch.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=5616"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/paksouch.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=5616"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/paksouch.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=5616"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}