{"id":15503,"date":"2026-09-13T09:23:22","date_gmt":"2026-09-13T09:23:22","guid":{"rendered":"https:\/\/paksouch.com\/?p=15503"},"modified":"2026-09-13T09:23:23","modified_gmt":"2026-09-13T09:23:23","slug":"nepra-approves-58-billion-11-year-electricity-generation-and-transmission-plan","status":"publish","type":"post","link":"https:\/\/paksouch.com\/?p=15503","title":{"rendered":"NEPRA Approves $58 Billion 11-Year Electricity Generation and Transmission Plan"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong>ISLAMABAD:<\/strong> The National Electric Power Regulatory Authority (<strong>NEPRA<\/strong>) has conditionally approved an <strong>11-year Integrated System Plan (ISP) for 2025\u20132035<\/strong>, with total investment of around <strong>$58 billion<\/strong> expected in electricity generation and transmission.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">According to NEPRA, the plan proposes adding <strong>26,045 megawatts (MW)<\/strong> of new power generation capacity over the next 11 years. This includes <strong>17,485 MW of committed capacity<\/strong> and <strong>8,560 MW of optimized capacity<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The plan also proposes retiring <strong>2,577 MW of existing generation capacity<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">By 2035, Pakistan&#8217;s total installed power generation capacity is expected to reach around <strong>62,657 MW<\/strong>. The plan also includes <strong>8,120 MW of net-metering capacity<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">More than <strong>$47 billion<\/strong> is expected to be required for additional power generation capacity, while around <strong>$10.65 billion<\/strong> will be needed for transmission projects.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The transmission component includes strengthening the national grid and developing new grid stations to support the additional electricity generation capacity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The plan also includes a <strong>40 MW power plant for Gwadar and Makran<\/strong>, along with a <strong>269 MW wind-solar hybrid project in Dhabeji<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">However, NEPRA did not approve a proposed <strong>$900 million battery energy storage programme<\/strong>. The regulator said comprehensive technical and economic studies were necessary before battery storage projects could be incorporated into the national power plan.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">NEPRA members also raised questions regarding the inclusion and removal of major projects by the <strong>Independent System and Market Operator<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Concerns were additionally expressed over the role of the <strong>Council of Common Interests (CCI)<\/strong> in national energy planning. NEPRA members maintained that changes to the national electricity policy cannot be made without the approval of the CCI.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Although the plan was ultimately approved, the <strong>NEPRA chairman and all three members recorded dissenting opinions<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The disagreement mainly concerned the inclusion or exclusion of projects without prior approval from the CCI.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The approved plan is intended to provide a long-term framework for Pakistan&#8217;s electricity generation and transmission requirements through 2035. It represents a major proposed investment in the power sector and aims to expand generation capacity while strengthening the country&#8217;s transmission infrastructure.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>ISLAMABAD: The National Electric Power Regulatory Authority (NEPRA) has conditionally approved an 11-year Integrated System Plan (ISP) for 2025\u20132035, with total investment of around $58..<\/p>\n","protected":false},"author":1,"featured_media":15504,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3],"tags":[],"class_list":["post-15503","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-pakistan"],"featured_image_urls":{"full":["https:\/\/paksouch.com\/wp-content\/uploads\/2026\/09\/11111-2026-09-13T142250.822.png",800,927,false],"thumbnail":["https:\/\/paksouch.com\/wp-content\/uploads\/2026\/09\/11111-2026-09-13T142250.822-150x150.png",150,150,true],"medium":["https:\/\/paksouch.com\/wp-content\/uploads\/2026\/09\/11111-2026-09-13T142250.822-259x300.png",259,300,true],"medium_large":["https:\/\/paksouch.com\/wp-content\/uploads\/2026\/09\/11111-2026-09-13T142250.822-768x890.png",768,890,true],"large":["https:\/\/paksouch.com\/wp-content\/uploads\/2026\/09\/11111-2026-09-13T142250.822.png",800,927,false],"1536x1536":["https:\/\/paksouch.com\/wp-content\/uploads\/2026\/09\/11111-2026-09-13T142250.822.png",800,927,false],"2048x2048":["https:\/\/paksouch.com\/wp-content\/uploads\/2026\/09\/11111-2026-09-13T142250.822.png",800,927,false]},"author_info":{"info":["admin"]},"category_info":"<a href=\"https:\/\/paksouch.com\/?cat=3\" rel=\"category\">Pakistan<\/a>","tag_info":"Pakistan","comment_count":"0","_links":{"self":[{"href":"https:\/\/paksouch.com\/index.php?rest_route=\/wp\/v2\/posts\/15503","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/paksouch.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/paksouch.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/paksouch.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/paksouch.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=15503"}],"version-history":[{"count":1,"href":"https:\/\/paksouch.com\/index.php?rest_route=\/wp\/v2\/posts\/15503\/revisions"}],"predecessor-version":[{"id":15505,"href":"https:\/\/paksouch.com\/index.php?rest_route=\/wp\/v2\/posts\/15503\/revisions\/15505"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/paksouch.com\/index.php?rest_route=\/wp\/v2\/media\/15504"}],"wp:attachment":[{"href":"https:\/\/paksouch.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=15503"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/paksouch.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=15503"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/paksouch.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=15503"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}